Analytical Laboratory

OSD Cleaning Optimization
Reduction VIA Cleaning Optimization

Project

Outcome
1

25% reduction in actual CIP time

2

33% reduction in PW costs

3

35% reduction in cleaning agent costs

4

Turnaround time reduced to < 1 day

5

New CIP implemented in 6 months

Project

Goals

Project

at a Glance

Hyde Engineering + Consulting reduced turnaround time to less than 1 day. Additionally, they earned a 25% reduction in actual CIP time and a 33% reduction in cleaning agent costs.

About

Hyde Engineering + Consulting

Hyde Engineering + Consulting has been a global leader in process system design, commissioning, and FDA compliance for regulated industries since 1993.

Our Results

40 - 60%

Reduction in Chemical Consumption

45 - 70%

Increase in CIP System Availability

40 - 70%

Reduction in Water Consumption

1.5 - 2.5x

Increase in Manufacturing Throughput

Project

Components

Design Space Exploration

Cleaning Agent Selection

Cycle Development