Cleaning Science

Waste & Utilities Burden
Reduction via Cleaning Optimization

Project

Outcome
1

Total 29% water reduction realized

2

30% reduction in chemical usage

3

30% reduction in cycle times

4

Statistical approach reduced validation

Project

Goals

Enable capacity increase for new products & eliminate capital investment need by:

Project

at a Glance

Hyde Engineering + Consulting reduced water usage by 29%, reduced chemical usage by 30%, and reduced cycle times by 30%.

About

Hyde Engineering + Consulting

Hyde Engineering + Consulting has been a global leader in process system design, commissioning, and FDA compliance for regulated industries since 1993.

Our Results

40 - 60%

Reduction in Chemical Consumption

45 - 70%

Increase in CIP System Availability

40 - 70%

Reduction in Water Consumption

1.5 - 2.5x

Increase in Manufacturing Throughput

Project

Components

Cleaning Cycle Assessment

Cleaning Pinch-Point Elimination

Detailed Statistical Analysis