1

12 new CIP skids (1 of 5 facilities)

2

Cleaning time reduction

3

Quality driven new all site cleaning validation programme

4

Science-based cleaning validation

Project

Goals

Project

at a Glance

Hyde Engineering + Consulting implemented science-based cleaning validation, reduced cleaning time overall, and introduced 12 new CIP skids in one of five facilities.

About

Hyde Engineering + Consulting

Hyde Engineering + Consulting has been a global leader in process system design, commissioning, and FDA compliance for regulated industries since 1993.

Our Results

40 - 60%

Reduction in Chemical Consumption

45 - 70%

Increase in CIP System Availability

40 - 70%

Reduction in Water Consumption

1.5 - 2.5x

Increase in Manufacturing Throughput

Project

Components

Cleaning Process Assessment

CV Programme

System Design Walkdowns